Youdaoplaceholder0 The installation method of the integrated turbidity meter mainly includes the following steps :
Youdaoplaceholder0 Site selection and preparation : Select an indoor environment that is dry, well-ventilated, dust-free and free of corrosive gases as the installation site. Make sure the installation site is far away from vibration sources and electromagnetic interference sources to ensure the stable operation of the instrument. Also, have the tools needed for installation such as a screwdriver, wrench, etc. .
Youdaoplaceholder0 Fixing device : Place the turbidity meter at the selected mounting location and use a screwdriver and wrench to secure the device to the mounting stand or wall. Make sure the device is secure and not shaky .
Youdaoplaceholder0 Connect to power : Connect the power cord to a stable power socket according to the power requirements of the turbidity meter. Note that the length and specification of the power cord should meet the requirements, and avoid using too long or too thin power cord .
Youdaoplaceholder0 Connect the water sample tube : Connect the water inlet pipe to the water inlet of the turbidity meter to ensure that the water sample can flow smoothly into the instrument. At the same time, connect the drain pipe in order to discharge the wastewater .
Youdaoplaceholder0 Check connections : After installation, carefully check that all connections are secure and not loose. Make sure power CORD, water inlet pipe, drain pipe, ETC. are properly connected, there is no water leakage, electricity leakage .
Youdaoplaceholder0 Calibration and zeroing : The turbidity meter needs to be calibrated and zeroed before use. Calibration with standard turbidity solution is usually required, and zero should be adjusted according to the instructions











FAQ:
Q1: What's your business range?
A: We manufacture PH/ORP/EC/DO/Chlorine/Turbinity meter and provide dosing pump, diaphragm pump,dosing system, pressure instrument, flow meter, level meter, dosing system and so on.
Q2: How about the quality of the managements?
A: We have a complete quality control system , all of our products will be fully pre-inspection by QC departments before shipping to you . We have the certification of ISO,CE we could send the certification test of our company to you.
Q3: Can you offer OEM or design services?
A: Yes, we have our own design department and production tools. We can make OEM products according to your requirements.
Q4: What are your terms of payment and delivery time?
A: We could accept T/T, Paypal, Western Union, Credit Assurance. Generally, we will arrange the shipment within 7 days after received payment.
Q5: How about warranty?
A: 12 months warranty.